Uttar Pradesh: A structural ropeway will be made to connect the Ghaziabad new bus Adda metro with the Meerut Road Tiraha metro. For this reason, talks between DMRC and RRTS are likely to start soon. In fact, with the introduction of the high-speed train, there can be a lot of people who will catch the metro from the new bus stand metro station. There will be many such passengers who will get off the metro and catch the high-speed train. The trouble for such passengers will be that they will have to cross the pedestrian road to reach both stations.
This can cause a lot of trouble for the passengers. To overcome this problem, there is a plan to connect both of these stations by building a new ropeway. It is yet to be decided when the work will start on this. GDA sources say that soon the RRTS officials will have to prepare a proposal regarding this. But it remains to be seen who will spend the money on this project. Several crores of rupees will be spent on this. It is believed that work on this project can start soon. After it is ready, it will be very easy to go to the high-speed station by metro.