---Advertisement---

Mumbai

Mumbai-Ahmedabad Bullet Train Project: New Stations Near Completion In Gujarat, Set To Slash Travel Time by 3 Hours

This project will have 12 thematically designed bullet train stations- Sabarmati, Ahmedabad, Anand, Vadodara, Bharuch, Surat, Bilimora, Vapi in Gujarat and Boisar, Virar, Thane and Mumbai in Maharashtra.

Mumbai-Ahmedabad Bullet Train Project Update: The Ministry of Railways has shared an important update regarding the Mumbai-Ahmedabad bullet train project. As per the latest update, stations on the Mumbai–Ahmedabad corridor in Gujarat are nearing completion. The total length of the corridor will be 508 km, including 352 km in Gujarat and the UT of Dadra and Nagar Haveli, and 156 km in Maharashtra.

---Advertisement---

Sharing the update, the Ministry wrote on X, “The #BulletTrain stations on the Mumbai–Ahmedabad corridor in Gujarat are nearing completion. With modern design, cultural identity, seamless connectivity and eco-friendly features, the stations will redefine passenger comfort and set new benchmarks in travel.”

---Advertisement---

About The Mumbai-Ahmedabad Bullet Train Project

This project will have 12 thematically designed bullet train stations- Sabarmati, Ahmedabad, Anand, Vadodara, Bharuch, Surat, Bilimora, Vapi in Gujarat and Boisar, Virar, Thane and Mumbai in Maharashtra.

Upon completion, the Mumbai-Ahmedabad Bullet Train Corridor will redefine intercity travel. It will reduce travel time and offer a faster, safer, and more reliable mode of transport. It will drive regional investment and create job opportunities in sectors like real estate, logistics, and tourism. The project will reduce congestion and improve urban mobility in Ahmedabad. After the inauguration of this project, people will be able to travel from Mumbai to Ahmedabad and Ahmedabad to Mumbai daily.

The Mumbai-Ahmedabad Bullet Train project will transform the economic landscape of Ahmedabad and the entire corridor by seamlessly connecting major cities into one unified economic powerhouse. This high-speed rail initiative is seen as a catalyst for growth, investment, and regional development apart from the faster travel.

6-Hour Journey To Be Completed In 3 Hours

Another important benefit of this Mumbai-Ahmedabad bullet train project, also called as the Mumbai-Ahmedabad High-Speed ​​Rail (MAHSR) is that it will reduce the travel journey between Ahmedabad and Mumbai.

This is the country’s first high-speed corridor, which is based on Japan’s Shinkansen technology. The bullet train will connect Mumbai (Maharashtra) to Ahmedabad (Gujarat). The bullet train will cover 12 stations at a speed of 320 kmph and complete the journey in 3 hours. Currently, it takes 6 hours and 45 minutes to travel from Mumbai to Ahmedabad, but the bullet train will reduce the journey by 3 hours.

When Will The Project Be Completed?

The trial runs are expected to start on the 50 km long route between Surat to Bilimora by 2026. From Vapi to Sabarmati, the route is expected to start in 2027, while the full train from Bandra-Kurla Complex (BKC) to Sabarmati is expected to start in the year 2028-29.

Also Read: GST Rate Rationalisation: Punjab FM Harpal Singh Cheema Urges Centre To Ensure Compensation For States

First published on: Aug 30, 2025 04:42 PM IST


Get Breaking News First and Latest Updates from India and around the world on News24. Follow News24 on Facebook, Twitter.

Leave a Reply

You must be logged in to post a comment.
Related Story

Live News

---Advertisement---


live

[LIVE] Parliament Winter Session 2025: Lok Sabha passes VB-G RAM G Bill to replace MGNREGA

Dec 18, 2025
Parliament Winter Session Day 1 4 Live Updates: Opposition Protest erupts in Parliament Over Proposed MGNREGA Renaming
  • 15:25 (IST) 18 Dec 2025

    Parliament Winter session day 14 Live Updates: Lok Sabha adjourned till 11 am on Friday

No shorts available at the moment.

---Advertisement---

Trending