---Advertisement---

Mumbai

MMRDA Enhances Metro Line 4 Access with Plan For Four Railway-Linked Foot Overbridges

The Mumbai Metropolitan Region Development Authority (MMRDA) is enhancing access to Metro Line 4 by planning four new foot overbridges that will connect suburban railway stations to Metro Lines 4 and 4A.

The Mumbai Metropolitan Region Development Authority (MMRDA) has started building a number of foot overbridges at four suburban railway stations to enhance last-mile connectivity on the Mumbai Metro Green Line-4 and 4A (Wadala-Thane), according to a report by Mid-Day.

MMRDA had called for tenders for foot overbridges at Pant Nagar, Vikhroli, Bhandup, and Vijay Garden (Thane), with Rs 129 crore estimated for the project. An additional Rs 8 crore will be spent for utility relocations as well. The new foot overbridges will connect the metro stations to existing skywalks, such as those at Ghatkopar, Vikhroli, and Bhandup.

---Advertisement---

The Mumbai Metropolitan Region Development Authority (MMRDA) has started building a number of foot overbridges at four suburban railway stations to enhance last-mile connectivity on the Mumbai Metro Green Line-4 and 4A (Wadala-Thane), according to a report by Mid-Day.

MMRDA had called for tenders for foot overbridges at Pant Nagar, Vikhroli, Bhandup, and Vijay Garden (Thane), with Rs 129 crore estimated for the project. An additional Rs 8 crore will be spent for utility relocations as well. The new foot overbridges will connect the metro stations to existing skywalks, such as those at Ghatkopar, Vikhroli, and Bhandup.

---Advertisement---

In February 2025 a second proposal covered 9,900 additional trees that are to be removed from development area; 7,016 to be relocated locally and 2,884 to be cut. This means the total trees to be cut in both phases is 3,716 which leaves 7,590 trees to be relocated and 1,094 trees left undisturbed. Overall, MMRDA is expected to mitigate the overall impact by planting close to 25,000 new trees.

Also Read: 2008 Jaipur Bomb Blast Case: Special Court Awards Life Imprisonment To All Four Accused

First published on: Apr 08, 2025 05:45 PM IST


Get Breaking News First and Latest Updates from India and around the world on News24. Follow News24 on Facebook, Twitter.

Leave a Reply

You must be logged in to post a comment.
Related Story

Live News

---Advertisement---


live

LIVE Updates | CAT Result 2025 (Shortly): IIM Kozhikode Results to be announced soon at iimcat.ac.in- Here’s how to download scorecards

Dec 23, 2025
  • 14:33 (IST) 23 Dec 2025

    CAT Result 2025 LIVE: Which institute accept these scores?

N24 Shorts Logo

SHORTS

World

What is going to happen in Bangladesh on December 25? German embassy shut down, US embassy issues advisory

Tensions between India and Bangladesh have escalated following the death of student leader Osman Hadi and recent violence, including the killing of a Hindu youth. Protests outside the Bangladesh High Commission in Delhi sparked diplomatic exchanges, with India calling media reports misleading.

View All Shorts

---Advertisement---

Trending