---Advertisement---

Delhi/NCR

NCRTC Successfully Tests Trains On Full 82 KM Namo Bharat Corridor, Covers Distance In Under 1 Hour

A 55 km section of the corridor with 11 stations is already operational for passengers at present. Final finishing works are underway on the 4.5 km stretch between Sarai Kale Khan and New Ashok Nagar in Delhi, and the approximately 23 km stretch between Meerut South and Modipuram in Meerut.

There is a good news for commuters as the National Capital Region Transport Corporation (NCRTC) has successfully completed a scheduled trial run of Namo Bharat trains on the entire Namo Bharat corridor between Delhi’s Sarai Kale Khan and Modipuram in Meerut. Remarkably, the train covered the full 82 km journey in less than an hour.

---Advertisement---

Interestingly, the Meerut Metro trains also ran alongside Namo Bharat trains during the trial. With this, the system successfully completed its tests. The trial run conducted on India’s first Namo Bharat corridor is a significant milestone, enhancing connectivity across the region. Notably, the Namo Bharat corridor runs between Delhi, Ghaziabad, and Meerut.

---Advertisement---

The Namo Bharat trains, running seamlessly, covered 82 km stretch at their maximum operational speed of 160 km per hour. Moreover, trains halted at every station between Sarai Kale Khan and Modipuram, completing the distance in less than an hour. This was the schedule targeted by NCRTC.

The Namo Bharat corridor features world’s first deployment of an advanced ETCS Level 3 hybrid signalling system over an LTE backbone. This signalling system has been integrated with platform screen doors (PSDs) and is installed at every station.

---Advertisement---

55KM Section Operational

A 55 km section of the corridor with 11 stations is already operational for passengers at present. Final finishing works are underway on the 4.5 km stretch between Sarai Kale Khan and New Ashok Nagar in Delhi, and the approximately 23 km stretch between Meerut South and Modipuram in Meerut.

Also Read: Delhi-Ghaziabad-Meerut RRTS: Namo Bharat Train Trial Runs Begin On Underground Shatabdi Nagar-Modipuram Stretch

First published on: Jun 23, 2025 12:14 PM IST


Get Breaking News First and Latest Updates from India and around the world on News24. Follow News24 on Facebook, Twitter.

Leave a Reply

You must be logged in to post a comment.
Related Story

Live News

---Advertisement---


live

Dhurandhar Box Office Collection LIVE Updates: Ranveer Singh’s film set for a massive opening day! Check advance booking figures

Dec 05, 2025
  • 13:53 (IST) 5 Dec 2025

    Dhurandhar LIVE Updates: Box office collection so far

N24 Shorts Logo

SHORTS

India

What’s special about White Fortuner Modi chose for Putin? Was it a cover to look ordinary? Check its specs and credentials

What makes the white Toyota Fortuner Modi chose for Putin special. Was it a cover to look ordinary? Explore its full specs and credentials

View All Shorts

---Advertisement---

Trending